T‑WORK ERP
Plan production on shared data
Connect orders, forecasts and bills of materials with machine, line and shift capacity. Start with existing Excel data and expand along an ERP roadmap.
Your current operations
When an order changes, how long does replanning take?
How does T‑WORK help?
- Forecasts, BOMs, stock and machine schedules are kept in separate files, creating version mistakes.
- Use agreed master data to calculate material needs, check machine load and schedule by line and shift.

Example scenario
When sales plans change
Planners refresh the forecast, recalculate material requirements from the BOM and check load by line. They adjust short-term schedules after reviewing shortages and shift conflicts.
Agree on planning inputs and outputs
Standardize item masters, BOMs, calendars, equipment capacity and standard times. Assign owners and define measures for comparing plan and actuals.
Process diagram
From master data to shift schedules
Standardize data
BOM, capacity, production times and defect rates.
Update forecasts
Import sales plans and adjust for order changes.
Schedule and validate
Allocate machines, lines and shifts. Check capacity, shortages and conflicts.