T‑WORK ERP

Plan production on shared data

Connect orders, forecasts and bills of materials with machine, line and shift capacity. Start with existing Excel data and expand along an ERP roadmap.

Your current operations

When an order changes, how long does replanning take?

How does T‑WORK help?

Forecasts, BOMs, stock and machine schedules are kept in separate files, creating version mistakes.
Use agreed master data to calculate material needs, check machine load and schedule by line and shift.
A planner reviews the production schedule on a screen beside the lines.

Example scenario

When sales plans change

Planners refresh the forecast, recalculate material requirements from the BOM and check load by line. They adjust short-term schedules after reviewing shortages and shift conflicts.

Agree on planning inputs and outputs

Standardize item masters, BOMs, calendars, equipment capacity and standard times. Assign owners and define measures for comparing plan and actuals.

Process diagram

From master data to shift schedules

  1. Standardize data

    BOM, capacity, production times and defect rates.

  2. Update forecasts

    Import sales plans and adjust for order changes.

  3. Schedule and validate

    Allocate machines, lines and shifts. Check capacity, shortages and conflicts.